Knowledgebase
Knowledgebase/Articles

Traffic limits and bandwidth upgrades

Every plan includes a monthly traffic allowance (for example 5 TB on Skipper, 10 TB on Morpho). Both directions count. The amount used in the current cycle is shown on the service page.

When the allowance is used up, the server's network is paused until the cycle resets on your renewal date. Nothing is deleted and the server keeps running; only the network waits.

Need more before the reset, or every month? Open Store → Bandwidth Upgrades: the packages (Breeze, Gust, Gale, Cyclone, Flow) add traffic to your server. Port speed upgrades (1–5 Gbit/s) are available on dedicated servers as a configurable option.

Unsure which one fits? Open a ticket with your server name and we will size it for you.

Was this answer helpful?